![Filename=P01421.jpg
Filesize=116KiB
Dimensions=559x800
Date added=Mar 17, 2016 P01421.jpg](albums/upload/print_P01401-P01600/thumb_P01421.jpg)
P01421182 views16 of 16 images of the pair of trestle bridges over the Canning River at Gosnells, SWR line, view between the bridges from the south east abutment
|
|
![Filename=P01422.jpg
Filesize=110KiB
Dimensions=800x464
Date added=Mar 17, 2016 P01422.jpg](albums/upload/print_P01401-P01600/thumb_P01422.jpg)
P01422240 views1 of 4 images of the buildings and other structures at the Ravensthorpe station precinct, HR line, water tower with a cylindrical tank, station building, carpenter's shed, goods shed and wheat stacking areas on top of the cutting
|
|
![Filename=P01423.jpg
Filesize=102KiB
Dimensions=800x469
Date added=Mar 17, 2016 P01423.jpg](albums/upload/print_P01401-P01600/thumb_P01423.jpg)
P01423222 views2 of 4 images of the buildings and other structures at the Ravensthorpe station precinct, HR line, loco workshops, side and end view
|
|
![Filename=P01424.jpg
Filesize=116KiB
Dimensions=800x474
Date added=Mar 17, 2016 P01424.jpg](albums/upload/print_P01401-P01600/thumb_P01424.jpg)
P01424228 views3 of 4 images of the buildings and other structures at the Ravensthorpe station precinct, HR line, barracks, side and end view, appears to be two goods sheds face to face
|
|
![Filename=P01425.jpg
Filesize=169KiB
Dimensions=800x474
Date added=Mar 17, 2016 P01425.jpg](albums/upload/print_P01401-P01600/thumb_P01425.jpg)
P01425200 views4 of 4 images of the buildings and other structures at the Ravensthorpe station precinct, HR line, barracks, side view.
|
|
![Filename=P01426.jpg
Filesize=165KiB
Dimensions=475x800
Date added=Mar 17, 2016 P01426.jpg](albums/upload/print_P01401-P01600/thumb_P01426.jpg)
P01426202 views1 of 13 images of the construction of the duplicate steel girder bridge No.1 at 16 miles 25 chains on the ER through the John Forrest National Park, starting construction on the east pier.
|
|
![Filename=P01427.jpg
Filesize=150KiB
Dimensions=800x457
Date added=Mar 17, 2016 P01427.jpg](albums/upload/print_P01401-P01600/thumb_P01427.jpg)
P01427200 views2 of 13 images of the construction of the duplicate steel girder bridge No.1 at 16 miles 25 chains on the ER through the John Forrest National Park, view along the line of the new bridge, existing bridge on the left hand side,
|
|
![Filename=P01428.jpg
Filesize=138KiB
Dimensions=800x467
Date added=Mar 17, 2016 P01428.jpg](albums/upload/print_P01401-P01600/thumb_P01428.jpg)
P01428193 views3 of 13 images of the construction of the duplicate steel girder bridge No.1 at 16 miles 25 chains on the ER through the John Forrest National Park, main girder being railed into position
|
|
![Filename=P01429.jpg
Filesize=183KiB
Dimensions=800x452
Date added=Mar 17, 2016 P01429.jpg](albums/upload/print_P01401-P01600/thumb_P01429.jpg)
P01429184 views4 of 13 images of the construction of the duplicate steel girder bridge No.1 at 16 miles 25 chains on the ER through the John Forrest National Park, main girder being lifted into position
|
|
![Filename=P01430.jpg
Filesize=162KiB
Dimensions=800x460
Date added=Mar 17, 2016 P01430.jpg](albums/upload/print_P01401-P01600/thumb_P01430.jpg)
P01430194 views5 of 13 images of the construction of the duplicate steel girder bridge No.1 at 16 miles 25 chains on the ER through the John Forrest National Park, main girder being manoeuvred into its final position
|
|
![Filename=P01431.jpg
Filesize=174KiB
Dimensions=800x477
Date added=Mar 17, 2016 P01431.jpg](albums/upload/print_P01401-P01600/thumb_P01431.jpg)
P01431202 views6 of 13 images of the construction of the duplicate steel girder bridge No.1 at 16miles 25 chains on the ER through the John Forrest National Park, one of the main girders being placed on the piers
|
|
![Filename=P01432.jpg
Filesize=183KiB
Dimensions=800x468
Date added=Mar 17, 2016 P01432.jpg](albums/upload/print_P01401-P01600/thumb_P01432.jpg)
P01432186 views7 of 13 images of the construction of the duplicate steel girder bridge No.1 at 16 miles 25 chains on the ER through the John Forrest National Park, one of the main girders being lifted from the wagons
|
|
![Filename=P01433.jpg
Filesize=170KiB
Dimensions=800x467
Date added=Mar 17, 2016 P01433.jpg](albums/upload/print_P01401-P01600/thumb_P01433.jpg)
P01433187 views8 of 13 images of the construction of the duplicate steel girder bridge No.1 at 16 miles 25 chains on the ER through the John Forrest National Park, main girder being lifted into position.
|
|
![Filename=P01434.jpg
Filesize=189KiB
Dimensions=800x469
Date added=Mar 17, 2016 P01434.jpg](albums/upload/print_P01401-P01600/thumb_P01434.jpg)
P01434184 views9 of 13 images of the construction of the duplicate steel girder bridge No.1 at 16 miles 25 chains on the ER through the John Forrest National Park, main girder being placed into position on pylons.
|
|
![Filename=P01435.jpg
Filesize=182KiB
Dimensions=800x456
Date added=Mar 17, 2016 P01435.jpg](albums/upload/print_P01401-P01600/thumb_P01435.jpg)
P01435177 views10 of 13 images of the construction of the duplicate steel girder bridge No.1 at 16 miles 25 chains on the ER through the John Forrest National Park, main girder being placed into position on pylons.
|
|
![Filename=P01436.jpg
Filesize=181KiB
Dimensions=800x475
Date added=Mar 17, 2016 P01436.jpg](albums/upload/print_P01401-P01600/thumb_P01436.jpg)
P01436169 views11 of 13 images of the construction of the duplicate steel girder bridge No.1 at 16 miles 25 chains on the ER through the John Forrest National Park, main girder being placed into position on pylons.
|
|
![Filename=P01437.jpg
Filesize=168KiB
Dimensions=800x455
Date added=Mar 17, 2016 P01437.jpg](albums/upload/print_P01401-P01600/thumb_P01437.jpg)
P01437181 views12 of 13 images of the construction of the duplicate steel girder bridge No.1 at 16 miles 25 chains on the ER through the John Forrest National Park, view along the bridge with girders in place
|
|
![Filename=P01438.jpg
Filesize=142KiB
Dimensions=800x457
Date added=Mar 17, 2016 P01438.jpg](albums/upload/print_P01401-P01600/thumb_P01438.jpg)
P01438174 views13 of 13 images of the construction of the duplicate steel girder bridge No.1 at 16 miles 25 chains on the ER through the John Forrest National Park, view of the bridge completed.
|
|
![Filename=P01439.jpg
Filesize=141KiB
Dimensions=800x455
Date added=Mar 17, 2016 P01439.jpg](albums/upload/print_P01401-P01600/thumb_P01439.jpg)
P01439199 viewsCommissioner of Railways, Mr. C. G. C. Wayne poses with a train crew in front of a carriage.
|
|
![Filename=P01440.jpg
Filesize=133KiB
Dimensions=565x800
Date added=Mar 17, 2016 P01440.jpg](albums/upload/print_P01401-P01600/thumb_P01440.jpg)
P01440229 viewsA conductor checks the ticket of a passenger on the "Australind"
|
|
200 files on 10 page(s) |
2 | ![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
|