Most viewed - print_P01401-P01600 |

P01571190 viewsCutting "C3" being excavated, standard gauge construction, Avon Valley line, blasting taking place.
|
|

P01564189 viewsTracklaying, Avon Valley line, standard gauge construction
|
|

P01567187 viewsCulvert under construction, standard gauge construction, Avon Valley line
|
|

P01488186 viewsSignalling and line signalling room, Forrestfield.
|
|

P01546185 views3 of 3 views of the Commissioner of Railways, Mr R Pascoe posing in front of G class 233, Perth, feigning oiling the loco
|
|

P01494184 viewsTrestle bridge under construction, Zanthus, TAR line. (ref "The Westland", April 1995, p.8)
|
|

P01566180 viewsConcrete girder bridge, standard gauge construction, Avon Valley line. Under construction.
|
|

P01570180 viewsCutting "C2" being excavated, standard gauge construction, Avon Valley line, view back to the entrance into the cutting.
|
|

P01475179 viewsBanks of relays, signal relay room. Location Unknown.
|
|

P01506178 viewsNew Administration and station building, Northam, streetside view.
|
|

P01508178 viewsStation building, Kambalda on the standard gauge Binduli Bypass, trackside and end view.
|
|

P01569178 viewsCutting "C2" being excavated, standard gauge construction, Avon Valley line, view into the cutting.
|
|

P01514177 viewsWork on track construction at a display of new equipment for the CCE
|
|

P01491172 viewsBanks of relays, relay room, Control tower, Forrestfield
|
|

P01489167 viewsSignalling equipment, Forrestfield
|
|

P01476166 viewsBanks of relays, signal relay room. Location Unknown.
|
|

P01516166 viewsWork on track construction at a display of new equipment for the CCE
|
|

P01520165 viewsApprentice coppersmith, welding
|
|

P01490161 viewsSignalling equipment, Forrestfield
|
|

P01517157 viewsWork on track construction at a display of new equipment for the CCE
|
|
200 files on 10 page(s) |
 |
 |
 |
 |
 |
 |
 |
10 |
|